Our Projects
Elevation Survey/FEMA Certificates

Prepared elevation certificates for many types of projects such as residential, apartments, commercial and governmental.


Kirby Drive, Houston, Texas.

3D scanning of one mile of Kirby Drive for Risk Management.


Valero Plant, Houston, Texas

3D Scanning of area to include storage tanks, overhead and electrical features, and piping.


42″ Katy-Addicks Repump Station Discharge Water (KARP)

Preparation of topographic survey, including plan and profile base maps and survey control maps for construction of 42″ transmission line.


Houston Community College System – Central Campus

Performed 3D Scanning of approximately 2 miles of streets around the campus for the purpose of sidewalk renovation and future improvement to buildings. Base on 3D scanned data, prepare topographic survey with all existing utilities.


Houston Community College System – South Campus

Provided Boundary and Topographic Survey of existing improvements 100 Acre Tract. Provided 1 foot contour plan for the site and cross sections of existing ditch. All work was performed in AutoCAD Civil 3D including DTM of site.


Texas Southern University Campus

Performed 3D scanning in the area for the LHO Spearman Technology Building and Radio Tower Control, New Science Center Building, Satellite Plant and the Health and Physical Education Building for future improvement.


University of Houston Parking Lots for Architecture and Gates Law Buildings and Visitors Lot

Performed topographic survey, engineering and construction staking for site, grading and drainage for 3 parking lots.


North East Independent School District, Claudia Taylor (Lady Bird) Johnson High School, San Antonio, TX

Construction staking of buildings and recreational facilities, and as built survey of all improvements.


Houston Community College System – Academic Center of the Northline Campus of Northeast College

Boundary and Topographic survey, platting, abandoning of easement and building layout, 22 Acre Tract.


Houston Community College System – Southwest Campus HayesRoad Campus Infrastructure

Provide Boundary and Topographic Survey of existing improvements 22 Acre Tract.


Cypress Fairbanks Independent School District, High School No. 10

Provided construction staking for building and access roads.


Houston Community College System – Stafford Campus

Boundary and topographic survey of 41.9 acre tract.


University of Texas Health Science Center, BREF/Neuroscience Building and Central Plant

Construction staking for new buildings.


Houston Community College System – Drennan Campus

Boundary and topographic survey of 10.7 acre tract.


METRO Rail Operating Center (ROC) Expansion

Topographic survey and 3D Scanning for the building and rail yard expansion inside the tract of land located along West Bellfort Avenue, Knight Road and Fannin Avenue. To include all top of rails and catenary systems all in 3D.


METRO Rail North and East End Corridors

Performed 3D Scanning for approximately seven miles of roadway for the purpose of risk management, cost estimates and to acquire more surveying information not showed in construction drawing.


METRO Light Rail for North and East End Corridors

Control Survey for the construction of METRO Light Rail approximately 14 mile of traverse and level loop.


METRO Kashmere Park and Ride

Topographic survey for the New Chiller Building and setting control in the area.


US Army Corps of Engineers, Battlefield Health and Trauma Center, San Antonio, Texas

Construction Staking and setting up controls. 3D scanning of existing hospital.


US Army Corps of Engineers, USACE Houston-Galveston Navigational Channel, Alexander Island

Staking of levee, control and calculation of quantities using 3D scanning.


Westheimer and Uptown Park Mobility Improvements

Construction staking of sidewalks and light poles.


URS-SPR West Hackberry Site

Setting two monuments and topographic survey for the SPR West Hackberry Site in Cameron Parish, Louisiana


Bryan Mound – SPR Pipeline Easement, Freeport,TX

Located underground pipe lines and right-of-way.


George Bush International Airport Control Points

Set approximately 60 points using GPS (static) all over the airport property using datum required by the City of Houston. These points are going to be used to map the entire airport property. This project is being performed in collaboration with the Martinez Corporation, a minority company specializing in aerial mapping.


Shell Technology Center

Provided construction staking of buildings.


Texas Department of Public Safety, OSB Mount, NASA Rd. Provided construction staking of buildings.


NASA-Roof Elevations

Performed grid elevations of three building’s roofs for structural analysis.


City of Houston Neighborhood Safe Sidewalks(Contract 1, 2 and 3)

Provided Topographic Survey of existing streets for the design and construction of sidewalk improvements.


Port of Houston – South Turning Basin Access Control, Fencing and Lighting

Provided topographic survey of entrances and entrance areas to facilitate the construction of new fences, lighting, and video security.


M D Anderson – U.T. Research Park

Construction staking and layout.


Port of Houston-Installation of U.S. Customs and Border Protection Radiation Portal Monitors at North Turning Basin

Construction staking and layout.


St. Luke’s Memorial Garden

Construction staking.


GPS/GIS Survey of Facilities (Phase I, Phase II)

Set horizontal and vertical control on site from NGS control. Mapped units, buildings, vessels, spheres, etc. Generated GIS database. Produced Plan & Profile Drawings


Electrical Substation II-Phase I, University of Texas, San Antonio

Set baseline for layout of 2500 linear feet of conduit, perform topographic survey and locate all existing utilities.


Boundary and Topographic Survey – Big Hill Strategic Petroleum Reserve

Set control with GPS. Produce a plan and profile of a 3.7 mile private road.


City of Houston – Department of Public Works & Engineering – Water Line Grid Extension along North Park Drive

Topographic survey of 9,000 linear feet and plan view for the construction of a 16″ diameter water line.


Gaumer Process – 10.2347 AcreTract, Unrestricted Reserve B, Fairmont Replat

Boundary, topographic and existing utility survey. Preparation of civil construction drawings for site grading, paving, site utilities and drainage to include detention pond.


Las Terrazas II Subdivision

Boundary, topographic and existing utility survey. Preparation of civil construction drawings for site grading, paving, site utilities and drainage to include detention pond to serve 75 lots for residential use. Also involved platting through the City of Houston.


Los Lagos Subdivision

Boundary, topographic and existing utility survey. Preparation of civil construction drawings for site grading, paving, site utilities and drainage to include detention pond to serve 57 lots for residential use. Also involved platting through the City of Houston.